After the structure is made watertight with roof, windows and doors installed. The dwelling is wrapped with sarking, cladding has commenced or completed. The walls and ceilings have been striated, most Frame Inspection items are addressed including plumbing, electrical and all services are roughed in. When the insulation is installed, the dwelling is ready for inspection before plaster is installed.
Standard inspection checks:
• Reinspection of any visible outstanding items noted in previous inspections if applicable.
• Straightness of walls and ceiling lines.
• Possible damage (holes, cuts/notches) to the frame from rough in of services.
This stage can be considered rather technical due to the complex nature of works to be inspected in compliance with many referred standards.